Language and connectivity review
Assess supported interface languages, phone integration, navigation, and approved application compatibility without bypassing security controls.
Quality gate · Vehicle preparation
Each vehicle receives a project-specific pre-delivery inspection, evidence record, and approved preparation plan before loading.

Pre-delivery inspection
Inspection scope depends on vehicle type, condition, available evidence, and buyer requirements. It does not replace a buyer-appointed independent inspection.
Run applicable diagnostics, review available battery-health evidence, and record warning codes or open findings.
Check screens, sensors, climate, lighting, and supported driver-assistance functions without claiming unavailable certification.
Document visible condition, paint readings where included, underbody observations, suspension, tyres, and signs requiring further review.
Check upholstery, controls, supplied accessories, odour, moisture indicators, and agreed functional items.
Localization and preparation
Availability varies by model, software version, destination rules, warranty terms, and supplier support. Any change is quoted and approved before work begins.
Assess supported interface languages, phone integration, navigation, and approved application compatibility without bypassing security controls.
Confirm the vehicle inlet, destination standard, adapter suitability, rated limits, and buyer-side charging environment.
Assess approved guards, bedliners, steps, maintenance kits, and other use-case equipment against load and warranty limits.
Modification and inspection gallery
Every slot includes a stable identifier so your later image-path list can map one-to-one without redesigning the page.


Include the model, condition, destination market, required evidence, and proposed modifications so the technical team can confirm scope and exclusions in writing.